Aker Solutions, Luanda

Cameron, Luanda

Prosjekter i utlandet (oil/gas related) – BO, PL, PGL, RIB, RIG

ProjectBuildingsDescription
Base in Luanda, Angola3.200 m2Complete project, base is in operation
Base in Onne Port, Nigeria2.200 m2Complete project, base is in operation
Base in Luanda, Angola3.900 m2Complete project, base is in operation
Base in Kakinada, India2.100 m2Complete project, base is in operation
Base in Luanda, Angola3.150 m2Complete project, base is in operation
Base in Baku, Asebajdsjan4,600 m2Preliminary studies
Base for Manifoils, Angola12.400 m2Preliminary project
New building in Luanda, Angola2.100 m2Preliminary project
Base in Lobito/Dande, Angola4.600 m2Preliminary project
Extension of base Luanda, Angola2.600 m2Preliminary project
Base Stockman Murmansk, Russia11.600 m2Preliminary project
Master plan Base area Murmansk77.000 m2Preliminary studies
Base in Onne Port, Nigeria4.700 m2Preliminary project
Base in Onne Port, Nigeria7.500 m2Phase-1 documents
Base in Alexandria, Egypt5.000 m2Preliminary studies
Base in Onne Port, Nigeria2.700 m2Phase-1 documents
XMT/Umbilical Ladol, Nigeria8.900 m2Phase-1 documents
Base in Pointe Noire, Congo1.500 m2Phase-1 documents (in progress)
Umbilical Nigeria8.400 m2In progress
Aker Solutions, Luanda Cameron, Luanda